PHL Surveyors have been contracted for all surveying needs from control and setout to as-built surveys and easements.
The building is over 20m tall with four suspended slabs requiring level datum and grids transferred to each level.
As-built surveys of each pour, together with column and stairwell positions enabled the engineers to monitor progress.